Safety Devices for HT Line & HT-Evacuated Solar Power Plant (Simplified & Detailed Guide)

In any HT (High Tension) evacuation system of a solar power plant, safety devices are not optional — they are essential for protecting transformers, cables, switchgear, and most importantly, human life.

Below is a simplified yet detailed explanation of the most critical safety devices, their importance, and correct usage.


1️⃣ Lightning Arrester (LA)

๐Ÿ”น Importance

  • Protects HT transformers, VCB panels, and cables from lightning surges and switching surges

  • Prevents insulation breakdown and transformer failure

  • Avoids costly equipment damage and plant shutdown

  • Acts as the first line of defense against overvoltage

When lightning strikes or a switching surge occurs, the arrester safely diverts the excess voltage to earth.

๐Ÿ”น How to Use

  • Install at:

    • HT line entry point

    • Near transformer HT side

  • Ensure dedicated and low-resistance earthing

  • Keep earth lead as short and straight as possible

  • Inspect periodically for:

    • Cracks

    • Leakage marks

    • Bulging or discoloration

  • Check earth connection tightness during maintenance


2️⃣ Vacuum Circuit Breaker (VCB)

๐Ÿ”น Importance

  • Trips during:

    • Overcurrent (OC)

    • Short circuit

    • Earth fault (EF)

    • Voltage abnormalities

  • Instantly isolates faulty section

  • Prevents fire, transformer damage, and cable burning

  • Essential for HT system protection

The VCB works as the main protective switching device in HT systems.

๐Ÿ”น How to Use

  • Set protection relays properly (OC, EF, UV, OV)

  • Perform relay injection testing before energizing

  • Never bypass trip circuits

  • Ensure mechanical & electrical interlocks are functional

  • Perform periodic maintenance & contact wear inspection


3️⃣ Protective Relays (OC / EF / UV / OV)

๐Ÿ”น Importance

  • Continuously monitors system conditions

  • Detects abnormal situations like:

    • Overcurrent (OC)

    • Earth fault (EF)

    • Under-voltage (UV)

    • Over-voltage (OV)

  • Sends trip signal to VCB

  • Prevents transformer burning & cable failure

Relays are the brain of the protection system.

๐Ÿ”น How to Use

  • Set parameters as per:

    • Transformer capacity

    • Cable rating

    • DISCOM requirement

  • Conduct annual testing & calibration

  • Perform secondary injection test before commissioning

  • Record all relay settings in documentation

  • Seal relay settings after final approval


4️⃣ Earthing System

๐Ÿ”น Importance

  • Safely carries fault current to ground

  • Protects manpower from electric shock

  • Reduces step & touch potential

  • Maintains system stability during faults

  • Critical for lightning protection effectiveness

Without proper earthing, no protection system works effectively.

๐Ÿ”น How to Use

  • Maintain earth resistance within permissible limits (as per IS/IEC & DISCOM)

  • Provide:

    • Separate equipment earthing

    • Separate body earthing

    • Dedicated LA earthing

  • Use proper size GI/CI strips

  • Perform periodic earth resistance testing

  • Maintain earth pit watering & inspection schedule


5️⃣ Ring Main Unit (RMU)

๐Ÿ”น Importance

  • Provides sectionalizing of HT network

  • Isolates faulty section without shutting entire plant

  • Improves supply reliability

  • Enables safe maintenance

  • Required for many DISCOM-connected systems

RMU increases system flexibility and reliability.

๐Ÿ”น How to Use

  • Follow proper switching sequence

  • Ensure mechanical interlocks are working

  • Confirm breaker open before earth switch operation

  • Never operate without proper SOP & authorization

  • Display mimic diagram clearly on panel


๐Ÿ”‘ Why These Safety Devices Are Critical

✔ Prevent transformer explosion
✔ Avoid cable failure
✔ Protect human life
✔ Ensure DISCOM compliance
✔ Reduce downtime & revenue loss
✔ Increase plant reliability


⚠ Golden Rules for HT Safety

  • ❌ Never perform live HT work

  • ๐Ÿ”’ Follow LOTO (Lockout/Tagout) strictly

  • ๐Ÿ‘ท Only trained & authorized manpower allowed

  • ๐ŸŒ Confirm earthing continuity before charging

  • ๐Ÿ“‹ Always follow approved SOP


๐Ÿงช Mandatory Pre-Commissioning Tests

Before energizing HT system, perform:

  • IR (Insulation Resistance) Test

  • HV Pressure / Hi-Pot Test

  • Transformer Ratio & Vector Group Test

  • Earthing Resistance Test

  • Relay Testing (Secondary Injection)

  • VCB Functional Test

  • Cable Continuity & Phasing Test


๐Ÿ”Ž Final Note

Pre-commissioning testing is the final safety and quality checkpoint before giving life to the HT system.

A properly protected HT evacuation system ensures:

  • Long transformer life

  • Safe plant operation

  • Zero major accidents

  • Stable revenue generation

If you want, I can convert this into:


https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg RRB JE, SSC AE/JE UPSSSC JE, SSC JE, CIVIL ENGINEERING MCQs, ELECTICAL ENGINEERING MCQs, preavious year quesion papers, dmrc, lmrc, drdo,rrb ntpc, ntpc, pgcil, dsssb, states board, GATE IES EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡ https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡ https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA

No comments:

Featured Post

MAJOR 10 PANDEMICS (MAHAMARI) IN HISTORY

OUTBREAK: 10 OF THE WORST PANDEMICS IN HISTORY BY PRAVENDRA KUMAR RAJPOOT Scientists and medical researchers have for years have dif...