Solar Plant HT Evacuation: Do’s & Don’ts That Decide Efficiency & Safety

Solar Plant HT Evacuation: Do’s & Don’ts That Decide Efficiency & Safety”


🟦 Slide 1 – Hook Slide

HT Evacuation Can Make or Break Your Solar Plant

Most EPCs focus on modules.

Real failures start at 11kV / 33kV.

Let’s talk about what actually decides efficiency & safety.


🟦 Slide 2 – Why HT Evacuation Matters

HT evacuation is not just power transfer.

It determines:

✔️ Plant losses
✔️ Transformer life
✔️ Protection reliability
✔️ DISCOM compliance
✔️ Long-term plant availability

Poor HT design = Expensive mistakes.


🟦 Slide 3 – DO’s: Design & Engineering

✔️ Finalize voltage level (11 / 22 / 33 kV) as per DISCOM approval
✔️ Keep inverter transformers close to inverter blocks
✔️ Optimize HT routing to reduce cable length
✔️ Size conductors based on current + voltage drop + short circuit level
✔️ Plan future expansion during layout stage

Design smart → Save losses for 25 years.


🟦 Slide 4 – DO’s: Equipment & Installation

✔️ Use DISCOM-approved VCB / RMU / CT / PT / LA
✔️ Ensure calibrated torque tightening
✔️ Engage certified HT cable jointers
✔️ Maintain proper bending radius
✔️ Provide oil soak pits & fire separation

Loose joints = Future breakdown.


🟦 Slide 5 – DO’s: Protection & Testing

✔️ Coordinate OC / EF / UV / OV properly
✔️ Perform IR, HV, contact resistance & relay injection tests
✔️ Confirm earthing resistance within limits
✔️ Install lightning arresters at line entry
✔️ Follow strict LOTO system

Protection is your last line of defense.


🟦 Slide 6 – DO’s: Documentation & O&M

✔️ Record relay settings & test reports
✔️ Label feeders and transformers clearly
✔️ Monitor voltage, losses & hotspot temperature
✔️ Conduct periodic thermography

Commissioning is not the end.
It’s the beginning of responsibility.


🟥 Slide 7 – DON’Ts: Design Errors

❌ Don’t keep long HT routes unnecessarily
❌ Don’t ignore voltage drop calculations
❌ Don’t design without DISCOM coordination
❌ Don’t mix radial & ring philosophy carelessly

Poor planning = Recurring problems.


🟥 Slide 8 – DON’Ts: Installation Mistakes

❌ Don’t allow under/over-torqued joints
❌ Don’t use unapproved connectors
❌ Don’t leave exposed strands
❌ Don’t allow wrong phase sequence

One mistake can trip the entire plant.


🟥 Slide 9 – DON’Ts: Safety Violations

❌ Never perform live HT work
❌ Never energize without earthing confirmation
❌ Never allow untrained manpower
❌ Never bypass protection during trial charging

No shortcut is worth a shutdown.


🟥 Slide 10 – DON’Ts: O&M Negligence

❌ Don’t skip thermography
❌ Don’t operate with defective relays
❌ Don’t ignore abnormal heating or sound
❌ Don’t delay rectification

Small warning signs prevent major failures.


🟦 Slide 11 – Key Engineering Message

HT evacuation is not just infrastructure.

It decides:

⚡ Efficiency
⚡ Safety
⚡ Reliability
⚡ Project profitability

Most plant losses come from what we don’t do right.


🟦 Slide 12 – CTA Slide

If you're working on:

🔹 11kV Solar Evacuation
🔹 33kV Switchyard
🔹 DISCOM Interconnection

I share practical HT QA & protection insights regularly.

Comment “HT CHECKLIST” if you want a structured HT inspection checklist.


📌 Caption for LinkedIn Post

In solar projects, real long-term performance depends on HT evacuation design and execution.

Most failures are not because of panels — but because of poor HT engineering discipline.

If you're a Solar EPC, QA Engineer, or Electrical Consultant working on 11kV / 33kV systems, these Do’s & Don’ts can save lakhs in rework and downtime.

Comment “HT CHECKLIST” to get a structured QA inspection format.

#SolarEngineering #HTEvacuation #SolarEPC #ElectricalEngineering #Switchyard #SolarQA #RenewableEnergy #IndianSolar


https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg RRB JE, SSC AE/JE UPSSSC JE, SSC JE, CIVIL ENGINEERING MCQs, ELECTICAL ENGINEERING MCQs, preavious year quesion papers, dmrc, lmrc, drdo,rrb ntpc, ntpc, pgcil, dsssb, states board, GATE IES EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,👇👇👇 https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,👇👇👇 https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA

No comments:

Featured Post

MAJOR 10 PANDEMICS (MAHAMARI) IN HISTORY

OUTBREAK: 10 OF THE WORST PANDEMICS IN HISTORY BY PRAVENDRA KUMAR RAJPOOT Scientists and medical researchers have for years have dif...