Sunday, January 15, 2023

Electrical (RE) II ACTM Correction

Electrical (RE)


 

SN

Letter No.

Subject

Issued date

ACTM Correction Slips

1.2004/RE/161/1 Pt-III(ACTM)Advance Correction Slip No. 12 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. I, 1994. Details regarding – Temporary Speed Restrictions and inclusion of additional proformas in conformity with Railways (Opening of Public Carriage of Passengers) Rules 2000.03.05.05
2.2004/RE/161/1 Pt-III(ACTM)Advance Correction Slip No. 13 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. I, 1994 – Revision in the Maintenance Proforma of ACTM.01.07.05
3.2004/RE/161/1 Pt-III(ACTM)Advance Correction Slip No. 14 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. II, Para 3.0 and Appendix IV, 1994 (Regulations for power line crossing of Railway tracks).24.05.06
4.2004/RE/161/1 Pt-III(ACTM)Advance Correction Slip No. 15 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. II, Appendix IV, 1994 (Regulations for power line crossing of Railway tracks).24.05.06
5.2004/RE/161/1 Pt-III(ACTM)Advance Correction Slip No. 16 to Railways Manual of AC Traction (ACTM) Vol.-II Pt. II, Appendix IV, 1994 (Regulations for power line crossing of Railway tracks).18.09.06
6.2000/RE/161/1 Pt IIIAdvance Correction Slip No. 17, Simplification (Modification/Revisions) in Paras  of Railways Manual of AC Traction (ACTM) Vol.-II Pt I, Para 21005 (item 6), Para 21007 (item 2 (i)), Para 21009 (Sub-para 1(c)), Para 21010 (Sub-para 1(a), Sub-para 1(b), Sub-para 1(c), Sub-para 3(f)).12.08.08
7.2001/Elect(G)/ 138/4 Pt.-I

Advance Correction Slip No. 24 to Railways Manual of AC Traction (ACTM) Vol.-III Pt I, Para 20970-05.

 

10.01.13
8.

2000/Elect(G)/161/1 Pt. III

ACTM  Correction Slip No. 18

19.01.09

9.

2000/RE/161/1/Pt-III(ACTM)

ACTM  Correction Slip No. 19

31.03.10

10.

2000/RE/161/1 Pt.III

ACTM  Correction Slip No. 20

03.11.10

11.

2000/RE/161/1 Pt. III/ACTM

ACTM  Correction Slip No. 21

10.11.10

12.

2000/RE/161/1 Pt. III/ACTM

ACTM  Correction Slip No. 22

24.01.11

13

2000/RE/161/1 Pt. III

ACTM Correction Slip No. 23

28.08.12

Standard Implantation

12014/RE/161/10Special OHE arrangement under Hancock ROB in Mumbai Division of Central Railway09.10.2014
2-----Heights of different rolling stocks26.03.2014
32007/RE/161/5IRSOD condonation cases coming to Railway Board’s office18.07.2012
4TI/CIVIL/FND/12OHE foundation Drawings for increased Implantation from 2800 mm to 2900 mm from center line of nearest track.26.03.2012

5

2000/RE/161/1 Pt. III

OHE Implantation

03.11.2010

62000/RE/161/1/Pt IIIStandard Implantation for new electrification works.3.11.2010
72006/RE/138/4Standard Implantation for new electrification work26.02.2010
82006/RE/138/4Standards for implantation to be adopted for RE17.09.2008

9

2002/RE/161/11

Standard implantation in future RE

14.11.2006

Clearances Under ROB/FOB

1

TI/OHE/EC-AC/11

Insulation Paint

24.11.2011

2

2002/CEDO/SD/IRSOD/O/2

Clarification regarding raising of under FOBs/ROBs

27.08.2012

Cost Cutting Measured for RE

1

92/RE/161/9 Pt. I

Reduction of Cost of RE Projects – Use of Spun PSC Masts

11.03.2005

22001/RE/220/4Traction power supply arrangements- augmentation for meeting present traffic need.05.07.2004
392/RE/161/9Reduction of cost of Railway Electrification25.03.1994

RVNL Policy Issues

12004/W-I/RVNL/15Enhancement of the revenue stream of RVNL02.06.2010

2

2004/W-1/RVNL/15

D&G Charges

04.01.2012

3

2004/W-I/RVNL/15

Sanction of DE, Revised estimates

14.08.2012

IRSOD Correction Slips

12011/CEDO/SD/IRSOD/Elect./02ACSs to IRSOD(BG).200421.07.2014
22011/CEDO/SD/IRSOD/Elect./02ACS No.15 to Indian Railways SOD (BG) 200419.06.2014
32011/CEDO/SD/17/O/Pt.IIACS No.2 to SSODs for Dedicated Freight Corridors of Indian Railways,201319.06.2014
42011/CEDO/SD/IRSOD/Elect./02ACS No. 13 to Indian Railways Schedule of Dimensions (BG)200421.10.2013
52012/CEDO/SD/IRSOD/O/1Addendum & Corrigendum Slip (ACS) No. 11 to the Indian Railways Schedule of Dimensions (BG) 2004.28.12.12
62011/CEDO/SD/IRSDO/Elect/2Addendum & Corrigendum Slip (ACS) No. 10 to the Indian Railways Schedule of Dimensions (BG) 200408.11.12

7

2011/CEDO/SD/IRSOD/Elect./02

ACS-7

14.03.2012

Other Reliability Issues

22002/AC-II/2/10/Vol.IIRevised Codal Life of Assets22.08.2012
12002/AC II/1/10(Vol.II )CODAL LIFE OF OHE25/02/2009

RDSO Issues

12007/CE-I/CT/18 Pt-19Price variation Clause-46.A to IR's General Conditions of Contract (GCC)-'General Instruction'.14.12.12
22006/RE/161/4/Vol-VI/FTS -30831Provision of Numerical Relay Panels on traction sub-stations.17.07.12

3.

2008/RE/161/4 FTS-761

Vendor Developmental procedure for contact wire from indigenous CCC Rods

27.04.12

Procurement of RS and T/Wagon Issues

12012/CEDO/SD/RS/04Condonation of infringement to IRSOD for 4-wheeler Self-Propelled MEMV16.10.2012
284/RE/158/PLNorms/yardsticks to be followed for provision of 8 wheeler tower wagons/4-wheeler tower wagons on electrified Railways.19.01.2006

Stores Matters

1DG/Misc.Merging of Part-I and Part-II sources for contact wire, cat. Wire & SCADA28.08.2014
299/RS(G)/709/1/Pt-IPlacement of full quality orders on sources under part -II for items where there is no part-I source.28/4/2004
Post Creation and Yardsticks
12013/E&R/3(1)/1Yardsticks for gazette staff in construction Projects for the year 2013-1429.08.2013

Policy Issues  for Outsourcing, Maintenance

1.2008/Elect(G)/150/12Out sourcing of PSI/TRD maintenance activities for newly electrified sections, transmission lines and sidings.15.05.13

High Rise OHE

12006/RE/161/4-Vol. VIIAllotment of execution of RE works included in Railway Budget 2013-1419.03.2013
22008/RE/161/8/Vol.II FTS-61292Decision to be taken for high rise OHE on Rewari-Manheru-Hisar-Ludhiana11.01.2013

SOP

3F(X) II-2006/PW/17Delegation of Powers To General Managers18.10.2006
2 CORE's SOP for consultancy contracts. 
1F(X)-II - 2006/PW/3Delegation of powers to DRM's for consultancy contracts.16.05.06
 F(X) II-2003/PW/1Delegation of Powers To General Managers09.01.2003

Contractual Issues (Works tenders)

12007/CE-I/CT/13Power of acceptance of Works Tenders27.08.2013
22002/CE-1/CI/37 JV Pt.VIII

Participation of Joint Venture Firms in Works Tenders on Indian Railways-Additional Provisions for GM/ CORE & CAO/USBRL/NR.

 

08.01.13
32002/CE-I/CT/37Participation of Joint Venture Firms in Works Tenders on Indian Railways07.09.2011

Railway Electrification Issues

12006/RE/161/4/Vol.II(FTS-R 58430/2015)Provision of TRD estimate in proposal for doubling/3rd line (PH:15) in electrified/undergoing electrification sections.11.06.2015
22013/RE/161/3OHE span in Alwar-Rewari section of NWR for new RE works27.06.2013
32003/Tele/RCIL/1 Pt. lXProcedure for undertaking digging work in the vicinity of signaling, Electrical24.06.2013
42013/RE/161/3OHE design in view of changed wind zones20.05.2013
52013/W-2/ER/DL/05Provision of Electrical estimate (Electrical/TRD) in initial stage while considering the proposal of doubling/ 3rd line in the Electrified territory.03.04.13
6F(X)-2008/RE/1Methodology and evolution of Railway Electrification Projects12.06.2008
Safety Issues
12009/RE/161/4Precautions in25 Kv AC system26.08.2014
Sanction of RE Projects
10-140 15/01/2011-PAMDGuidelines for  Plg. Comm.for In Principle Approval to RE Projects23.08.2013
RE with New Line, GC, Doubling
 2016/W-II/ECoR/Misc/24Revision in OHE parameters.31.01.2017
1.2016/W-I/Genl./NL-REOHE Layout Planning in RE Works on Single Line27.01.2017
2.2014/RE/161/14/Letter of AM/Plg. For RE with doubling/tripling etc.02.09.2014
Issues With CRS,CCRS
1200O/RE/161/1/pt.-lll (ACTM) pt.-lIntroduction of Rolling Stock on Newly Electrified Section19.01.2012

Tower Wagon Issues

1.84/RE/158/1/2 FTS-2862Future policy for Procurement of Tower Wagons16.12.11
2.2012/CEDO/SD/RS/04Design and Procurement of only 8 -Wheeler rolling stocks on Indian Railway System17.10.12
3.2002/AC-II/2/10/Vol-IIRevised Codal life of Assets22.08.12
https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg RRB JE, SSC AE/JE UPSSSC JE, SSC JE, CIVIL ENGINEERING MCQs, ELECTICAL ENGINEERING MCQs, preavious year quesion papers, dmrc, lmrc, drdo,rrb ntpc, ntpc, pgcil, dsssb, states board, GATE IES EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,👇👇👇 https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,👇👇👇 https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA

Featured Post

MAJOR 10 PANDEMICS (MAHAMARI) IN HISTORY

OUTBREAK: 10 OF THE WORST PANDEMICS IN HISTORY BY PRAVENDRA KUMAR RAJPOOT Scientists and medical researchers have for years have dif...