Monday, January 9, 2023

ACTM Volume-3 II CHAPTER II MAINTENANCE OF ROLLING STOCK - GENERAL

CHAPTER II

MAINTENANCE OF ROLLING STOCK - GENERAL

30200 Shed Organisation

1. At the head of an electric loco (or EMU) shed will be Senior Divisional Electrical Engineer (Rolling Stock) whose duties will be generally as defined in para 10108. He will be assisted by one or more officers in lower ranks depending upon the work load.

2. The organization pattern in a loco shed will be generally as shown below:


30201 Duties of Shop Superintendent/Chief Traction Foreman (Maintenance)

He being supervisor in charge of the loco shed directly under the control of DEE / AEE (RS), as the case may be, will be responsible for the maintenance of locos. His chief duties are:

1. To guide and instruct supervisors and men under him in the correct methods and schedules laid down .for maintenance and repairs.

2. To keep a close watch on maintenance so as to reduce the unscheduled withdrawal of locos to the minimum and to watch the performance of equipment involved in frequent troubles.

3. To Initiate appropriate steps for recommissioning locos out of service.

4. Execution of various approved modifications and to maintain locos and the loco shed in a clean condition.

5. To keep a. watch on the availability of stores for maintenance and modifications and to initiate appropriate steps for timely recoupment.

6. To ensure efficient maintenance of the shed plant and machinery and ancillary services.

7. To coordinate with TLC and TF(R) regarding withdrawal of locos for shed attention, POH and nomination of relief locos from shed.

8. To coordinate with the Training School regarding relief of staff for training and refresher courses.

9. He will be the stock holder of all equipments on locos, assemblies and sub assemblies and unit exchange spares.

30202 Duties of Electrical Foreman (Planning and Progress Office)

1. To maintain liaison with the operating wing and ensure timely availability of locos from the shed.

2. To plan the scheduled and unscheduled repairs of locos to the shed as required, keeping in view the shed capacity and proper utilization of inspection, lifting and heavy repair berths.

3. To issue job cards and to coordinate the working of the sections so as to ensure timely turn-out of the locos after attention / repair.

4. To maintain necessary documents to enable scheduled attention to various locos and for revision of maintenance practices and instructions.

5. To keep a watch on tests and trials and performance of modified equipment and maintenance of requisite records in this connection.

6. To maintain the History Register, Equipment Cards, Modification Charts and other prescribed records.

7. To coordinate with the workshops regarding release of locos for POH and special shop repairs and to arrange for dispatch of requisite information and records to shops.

8. To maintain statistics of engine-kilometres, failure records etc.

9. To keep a record of wheel wear and to programme for tyre-turning.

10. Furnishing shed statistics to HQ office.

30203 Duties of Section Supervisors

Each of the sections mentioned in 30200 will be under a supervisor of appropriate rank who will be directly responsible for the following:

1. He will scrutinize the job card for the loco received for inspection/unscheduled repairs, carefully study the work to be carried out and based on his personal inspection, list out additional items of work, if any, for approval as explained in para 30210.

2. He will allot the work to the staff under him with special instructions, if any.

3. He will ensure that the work is carried out within the time allotted and the loco released in time.

4. The supervisor will maintain a record of work done by staff with the purpose of taking corrective action in the event of reported malfunctioning of the equipment immediately after overhaul/repair

5. He is responsible for drawing, distributing and recording of all stores required by his section, as well as any tools and testing instruments.

6. Before returning the job card in token of having completed the work, he will satisfy himself that all work has been done satisfactorily. To ensure this he will make frequent checks while the work is in progress.

7. He will ensure necessary co-ordination with other sections as well as with PPO.

30204 Distribution of Work Load in the Shed

Even though the classification of section in different Railways varies, the work load arrangement is typically as under:

E1: a) To carry out preventive maintenance schedule inspections and overhauling schedules on battery charger, rectifier blocks.

b) Trouble shooting and investigations of Unusual Occurrence Reports (UOR). withdrawal and failures of Electric Locos/EMUs.

c) To oversee checking and complete testing of Elect, locomotives nominated for VIP / Superfast trains and special trains.

d) To oversee checking and complete testing of the nominated locos /EMUs by PPO.

E1 section shall have a Quality Assurance Group consisting of competent supervisors and artisan staff who will carry out superchecking on nominated scheduled/unscheduled locos.

E2: a) Test before and test after of all schedule inspection.

b) Electrical inspection and repairs (minor) of parts noticed defective during inspections i.e. head lights. flasher lights, electrical equipments in BA panels, TFP, RPS, SL, Programme switches, MP. EMC, DBR. SMGR. CGR, tap changer, cables, cable sockets and cable connections.

E3: a) To carry out scheduled inspection, unscheduled repairs, modifications, overhauling of traction motors.

b) Connection and disconnection of traction motors before lifting and after lowering.

c) To carry out scheduled inspection and unscheduled repairs, modifications and overhauling schedule of auxiliary motors.

d) To disconnect and connect auxiliary motors while removing / refitting during overhauling scheduled and unscheduled repairs.

E4: a) To carry out scheduled inspections, unscheduled repairs, modifications and overhauling schedule oi i all delicate and precision electrical equipment like relays, speedometers, ammeters, voltmeters and circuit breakers etc.

b) To disconnect and connect speedometer connections /DJ connections during unscheduled repair.

E5; Major repairs and overhauling of EP and EM contactors, smoothing reactor. RPS. flasher light. MP. TFP oil filtration, CGR, SMGR and tapchanger (during IOH schedule/unscheduled visits) and modifications.

E6: a) Removal and fitment of EMCs, EPCs, RPS. DBR during AOH schedule.

b) Removal and fitment of SL, SMGR, Tap changer during IOH schedule.

c) Overhauling of BA panel, head light, TK panel, SB Panels, rotary switch board and switches during AOH/IOH schedule.

d) Cleaning of cable junction boxes and cables during overhauling.

e) Overhauling of SMGR and GR during AOH schedule.

E7: Recabling work, partial or full.

E8: Electronic labs and PCBs etc.

M1:   a) Inspection and running repairs of mechanical parts, under frame, brake gear, wheels and axles, buffing gear, body doors and windows, locks, side glasses, look out glasses etc.

b) Special checks.

c) Carry out pre-summer, pre-winter and pre-monsoon checks. -

M2: AOH/IOH schedule work on i.e. centre pivot, side bearers, roof, buffing gear, cattle guard, rail guard, side glasses, look out glasses, doors, windows and locks.

M3: Inspection, repairs and overhauling of pantograph. 

M4: a) To supervise the work of machine shop.

b) To supervise proper functioning of Tool Room and its upkeep.

c) To supervise and execute the re-profiling of wheel sets of electric locomotives on the pit wheel lathe and its preventive maintenance.

M5: a) To carry out scheduled inspections and overhauling schedules on all pneumatic equipment except compressors and exhausters.

b) Testing of all pneumatic equipments on test bench after overhauling.

c) To carry out scheduled inspections, unschedule repairs, modifications and overhauling of compressors, exhausters and auxiliary compressors.

d) Removal and fitment of compressors, exhausters and auxiliary compressors during overhauling, scheduled/ unscheduled visits.

M6: a) Mechanical disconnection and connection, lifting and lowering of locomotives.

b) Heavy repairs and overhauling of bogies and other mechanical components like wheel sets, springs, axles boxes etc.

c) Traction motors assembly and dis-assembly. 

M7: Remetalling of suspension bearings.

PPO: a) Receipt and dispatch of locomotives/ EMUs for their scheduled and unscheduled visits,

        b) Planning of scheduled and unscheduled repairs of locomotives / EMUs.

c) Monitoring the performance of developmental equipment.

d) Maintenance of history books, history cards of equipment fitted.

e) Keeping liaison with RSO regarding calling of locomotives/EMUs for scheduled/unscheduled work.

f) To keep record of wheel wear and to programme reprofiling.

g) To scrutinize Electric Loco/EMUs log books on arrival of locomotives and issuing all job cards to the section supervisor for proper attention to the defects and to ensure that the work is done when the job cards are returned.

S1: All works pertaining to procurement of stores and liaison with HQ for timely procurement of stores and upkeep of custody stores for non-stock items.

S2: Specification updating section. 

S3: Tests and Trial Sections.

G:    a) Electric and mechanical millwright sections.

b) Maintenance of cranes and M&P items. 

c) General upkeep of shed.

d) Road Transport. 

Technical Section

All technical correspondence of the shed i.e. outside and within shed, updating and feeding of technical data in computer etc

Laboratory

Physical and chemical testing of all items including ultrasonic testing of axles and shafts.

Drawing office

All drawing work, preparation of office estimates etc.

Computer Section

Operation of computer - collection of data and processing.

30205 Technical Section

The chief responsibility will be :

i) Keeping track of every failure of components. The failure should be analyzed in detail on the basis of which should emerge the analysis of the causes of failure, suggestions for improvements, modifications etc.

ii) Documentation of all technical information.

iii) Keeping a watch that the maintenance instructions issued to the shed staff are up-to-date and ensuring that the instructions are explained to the concerned staff.

30206 Specification Updating Section

This section will be responsible with the drawing office, to update list of specifications and drawings against which different items are to be ordered and for issuing stocking advices to Stores Department. It should also keep records regarding consumable stores so as to pin-point any abnormal consumption for effective investigation.

30207 Test and Trials

The observations regarding tests and trials should be carefully documented for the benefit of improving specifications or modifications to inspection schedules. The necessary documents should be centralized and kept in the PPO.

30208 Materials Management

1. This subject is dealt in detail in Volume I. A few relevant items are being mentioned here.

A. The various components - sub-assemblies and spare parts shall be purchased from the original/ approved supplier of equipment. Railway may however make out a compendium of approved suppliers for each item/equipment, based on RDSO's/production unit's list. Any variation from the same shall only be permitted personally by Chief Electrical Engineer.

B. For bringing in new suppliers in the compendium of approved suppliers, CEE may personally authorise use of untried and untested equipment for field trials. Special care is needed while approving any new make and type of brushes for traction motors.

C. Storage of Rubber Components

Storage procedures in general for any type of rubber components are given below: -

i) Rubber components should be kept away from direct sun light preferably in dark place. Direct sunlight causes much faster degradation of the rubber components.

ii) They should be stored in a cool place as far as practicable, preferably below 30°C.

iii) The humidity of the storage condition should not be such that condensation of moisture takes place on the surface of the material.

iv) In the vicinity of these materials, any loose electrical connections should be avoided, as these cause production of ozone which adversely affects rubber.

v) Rubber materials should be stored away from contact with certain materials particularly those containing copper and manganese which act as poisoning agents, aiding their fast degradation.

vi) Under no circumstances rubber materials should be stressed during storage The portions under stress undergo deformations with permanent set leading to degradation. The materials should be stacked in such a way so that any super-imposed stresses are substantially avoided.

vii) Any contact with grease or oil should be avoided as these cause swelling, softening and deterioration of rubber materials.

viii) French chalk should liberally be applied on the surface of rubber materials.

ix) Great care is to be exercised so that the material is used in the order of their receipt in the stores The rubber material whether under storage or in use continues to deteriorate. The only difference is that under service condition, deterioration is much faster. Every moment of storing is at the cost of useful life and prolonged storage of the material may render it unserviceable due to progressive deterioration.

30209 Demarcation of Responsibility between Sr. DEE (RS), DEE and AEEs

The DEE / AEE (maintenance) will be responsible for day to day activities in the shed including unscheduled attentions and scheduled inspections He will be particularly responsible for induction of any new type of stock in the shed and ensure that the maintenance schedule for such stock are finalized in the shortest possible time.

The Sr. DEE will in addition concern himself with the broader aspects of work and forward planning such as watch-out for organizational shortcomings, indenting and progressing the procurement of forward delivery spares, maintaining a close watch on the functioning of the PPO and above all, exercising vigilant technical control over unusual occurrences, recurring failures and unscheduled booking of locos to the shed and shall be in close liaison with Sr DEE (OP)

30210 Job Cards

For each loco/EMU received in a shed for scheduled or unscheduled attention, the PPO will issue a job card in proforma 2.01 to each section incorporating the following:

a) The nature of inspection (IA, IB etc.). Refer to chapters III and IV.

b) Additional items of work to be carried out on the loco/EMU by the section, based on booked defects, pre-inspection of the loco or planned modification.

c) The time by which the loco/EMU is required to be released.

Based on his own inspection, if the Section Chargeman finds that any items in addition to those mentioned by PPO are required to be attended to, he will get such work approved by TF (M) and get the additional items also entered in the job card by PPO. The job card will thus contain a complete record of all work done on a loco during its visit to the shed. When the work is completed, the Section Chargeman will sign the job card indicating the time of completion of the work and the names of the workers. The loco/EMU should be offered by the PPO for final inspection by El only after job cards from all sections have been received back duly signed by the respective Chargeman

30211 Shed Facilities

Machinery and plant for Loco Sheds

The list of machinery and plant recommended for a loco shed to cater for inspection, maintenance, overhaul and repairs including IOH of locomotives is indicated here under.

List 1 - General Purpose Machines and Tools

 

A. Machine Section
1.Lathe 250 mm swing, 1500mm between centres 1
2.Lathe 150 mm swing, 1000 mm between centres 1
3.Portable tool post grinder for 12mm to 100mm dia wheel 1
4.Radial drilling machine1
5.Universal milling machine 900mm x 300mm table with index.1
6.Shaping machine, 600mm stroke 1
7.Do all band saw . 1
8.Pillar drill (40mm hole in M.S.) 1
9. Power hacksaw to cut 150 mm dia M.S. 1
10. Floor grinder 450 mm dia wheels 1
11. Pipe threading machine 1
12. Pipe threading die sets 2
13. Pipe bending machine 1
14. Hand operated shearing machine 1
15. Marking table 1
B.Relay Room..
1Sensitive drill (20mm hole in M.S.)1
2Watchmaker's lathe1
C.Welding and White-metalling Section.
1Portable welding set 300 A dc.1
2Portable transformer welding plant 350 A ac.1
3Oxyacetylene welding and cutting set with 25 sets of cylinders for oxygen and acetylene.1
4Eutectic weld deposit torch set1
5Smith's hearth1
6Smith's anvil and swage blocks.2
7Centrifugal white metalling plant (shop made)1
8Electric Furnace for melting bearing metal.1
D.Painting Section..
.Spray guns portable compressor unit and reservoir with 2 spray guns1
E. Tool Room...
1 Portable electric tools : grinder drills, Wrenches1
2Torque wrenches5 set
F.Compressed Air. 
.Air compressor - complete with air drier and filter after-cooler, reservoir, outlet valves 250 cfm ,9 kg/cm22
G.Vacuum cleaning, Water Pumps and Sanding..
1Portable vacuum plant2
2Filter cleaning plant (shop made)1
3Pit dewatering portable electric pump1
4Booster pump for washing lines.2
5Sand drying and sieving plant1
HOther Electrical Equipment 
1Battery charger2
2Portable battery charger1
3Loading resistor for battery1
4Distilled water plant (Electrical)2
5Oil centrifuging and filtering plant1
6Pneumatic crimping tool for power cables1 set
7Hand crimping tool for control cables2 set
8Panto assembly fixture (shop made)1 set

List 2 - Special Purpose Machines and Tools

 
A. Bogie Wheel Sets. 
1Pit type wheel lathe1
250 tonne hydraulic press1
310 tonne hydraulic press1
4Horizontal boring machine 1000 mm x 1000 mm table1
5Hack's burners2
6Bogie squaring jig1 set
7Wheel profiling set (tool room)1
8Grease guns and lubricating equipment (for each type of oil or grease)3 set
9Bearing extractor for transmission gears1 set
10Lifting beam for locomotive body with stand2
11Lifting tackle for bogie1 set
12Spring testing equipment1
13Shock absorbers and snubbers testing rig1
1425/30t hydraulic jacks for attending athermos bearing5
B.Traction Motor and auxiliary machine Rewinding section 
1Pinion extractor2
2Pinion heating oil bath or induction heater2
3Auto transformer rectifier unit 100V, 150 A dc1
4Commutator turning lathe1
5Mica Undercutting and chamfering machine for armature1
6Armature banding lathe1
7Dynamic balancing machine for armature 1
8Vacuum impregnating plant1
9Baking oven 200 degree C with trolley2
10Baking oven 40-60 degree C with trolley2
11Baking dynamometer with test bed1
12Contactor and relay coil winding machine2
13Brazing tongs with transformer1
14Brazing extractor2 set
15Hand operated shearing machine for insulation1
16Traction motor assembly fixture, for each type of motor.1 set
17Grease Guns2 set
18Commutator electric soldering irons.6
19Surge Tester1
20Dynamic balancing machine for auxiliaries1
21Bearing Extractor and inserter for traction motor and auxiliary machineries1
22TIG Welding Kit1
.List 3 - Testing and Measuring Instruments and Panels.
A. Testing Panels..
1Test and calibration panel with meters for each type of relay.1
2Test and calibration panel with meters for speedometers1
3 Test panel with meters for auxiliary machines1
4Loading dynamometer with test bed for auxiliaries1
5 Test panel with meters for contactors, circuit breakers1
6Brake and pneumatic equipment test panel including air compressor 500 litre per min. 15 kg/cm2.1
.B. Testing and Measuring Instruments 
12500 V megger2
2500 V megger6
3Universal multimeter6
4Portable voltmeter dc3
5Portable voltmeter ac3
6Portable ammeter ac3
7Portable ammeter ac3
8Current transformer set 20 to 2000 A2 set
9Set of shunts for dc ammeter 75m V 2000 A2 set
10Millivoltmeters 0-75mV2
11Vacuum tube voltmeter1
12Cathode Ray Oscilloscope 10 cm display double beam1
13High voltage tester 0-75 kV1
14High voltage tester 0-15 kV1
15Oil tester 0-50 kV1
16Current injection set 2000 A, 3 V dc1
17Silicon diode tester3
18Ductors2
19Contact Pyrometer (0-500° C)3
20Ultrasonic crack detector1
21Zyglo ultraviolet light crack detector1
22Brinell hardness tester1
23Shore hardness tester1
24Spring balance 0-1 kg2
25Recording ammeter2
26Recording voltmeter2
27Spring balance 0-3 kg2
28Spring balance 0.5 kg2
29Spring Tester1
30Battery voltmeters2
31Anemometer2
32Manometer2
33Vibration meter1
34Capacitance and inductance bridge1
35Clip-on ammeters 0-5-10-25-10 250 A2
36Dial gauges, vernier calipers, micrometers and feeder gauges2
37Revolution counters3
38kWh meter with accessories for mounting on loco2
39Electric coil tester1
40Electric timer1
41Portable relay testing kit1
42Commutator profile recorder1
43Stopwatch2
44Illumination meter1
45Wheat Stone bridge1
46Distilled water tester1
47Stroboscope/tachometer1
48Gear teeth micrometer1
49Tan-delta measuring instrument1
50Dissolved Gas Analyser1
. .
.List 4 - Lifting, Handling and Transport equipment.
A. Lifting and Handling Equipment..
145 tonne electric overhead travelling crane with 6 tonne auxiliary hoist (50 tonne cranes for 132 tonne locomotives)2 no.
225 tonne EOT crane with 6 tonne auxiliary hoist1
315 tonne EOT crane1
41.5 tonne monorail with electric hoist (in Stores Depot)2
5Lifting tackles for transformer, traction motor 1 set armature, loco underframe, roof sections, bogie, wheel set, loco body etc.1 set
61 tonne monorail with chain pulley hoist2
72 tonne chain pulley hoist3
8Capstan units 3 tonne5
9Tirfor 3 tonne3
10Hydraulic jack 50 tonne with traversing bases1 set
1150 tonne screw jack with traversing bases1 set
1220 tonne high lift hydraulic jack with traversing bases1 set
13Accommodation bogies..
B.Transport Facilities..
12 tonne fork lift battery truck1
21 tonne pallet battery truck1
31 tonne material hand trolley platform type (rubber tyres)3
41 tonne hand pallet trolley3
57.5 tonne trolley on rail (for traction motors)2
65 tonne truck1
7Jeep with trailer1
8Departmental wagon for armature1
9Departmental wagon suitably modified for transportation of 2 wheels and bogies2
C. Weighing Machine/Scales..
1Weighing machine 1 tonne (Stores Depot)1
2Weighing machine 50 kg (Stores Depot)1
.List 5 - Work Benches, Lockers etc..
1Workmen's tables, battery charging benches, armature trestles.
2Bench Vices
3Individual fitters tools.
4Locks and keys for workmen.
5Steel almirahs and stores racks.
6Steel tables and chairs cardex boards, filing cabinets, index cards cabinets, typewriter, calculating machines for PPO's office.
7"Tables chairs for offices and supervisors, almirahs, filing racks, cabinets, typewriters, duplicator, drawing office, and Ferro printing equipment. 
8Time office equipment, time clock, ticket filing racks, tables and chairs.
9PCB testing kit.

30212 Modification of Designs for Rolling Stock

Railways should not adopt any new design or modify the existing approved designs except for trials, without the prior approval of RDSO.

Procedure for Initiating and Progressing Modifications

1. One shed which has the bulk of the holdings of a particular class of loco / EMU will be nominated by the RDSO, in consultation with the Railway, as the parent shed for that class of loco /EMU.

2. Each Railway will continue to tackle operating and maintenance problems as hitherto, but will also furnish complete particulars of all problems and failures on each class of loco /EMU to the corresponding parent shed and RDSO together with the modifications evolved by it and further suggestions, if any.

3. The nominated parent shed will then collate all the information in regard to each type of failure, study the merits of the different improvements suggested from all angles and submit recommendations to the CEE of the Railways, giving, full particulars of the most satisfactory improvements / modifications after they have been actually tried out in service and found feasible. When any defect is found to be intractable and expert investigation is necessary, a comprehensive note on the subject should be prepared and submitted by the parent shed to the Headquarters Office. CEE will arrange to forward the considered recommendations to RDSO.

4. The recommendations received from the parent Railway will be subjected to a further scrutiny and analysis by the different wings of the RDSO after which final instructions regarding the standard approved method of modification / improvement will be issued to all concerned, giving an identification serial number to each with full details and drawings required for carrying it out.

5. On receipt of the instructions from RDSO, each user Railway will arrange to carry out the modifications on priority on locomotives / EMUs until the work is completed in all locomotives/EMUs. Progress of implementation of the modifications will be regularly sent to CEE's office by each shed and CEE's office in turn will send a quarterly report of progress to RDSO.

30213 Records and Register to be Maintained in LOCO / EMU Sheds

Particulars of some of the basic records to be maintained by sheds are given below:

1. History Book - For each electric locomotive / motor coach, a History Book should be maintained in the loco / EMU shed by the Planning and Progress Office, (PPO). The History Book should have separate pages allotted for recording the items listed below in the proforma shown against each

a) Pre-commissioning details.
i) Contract or order number against which received.
ii) Date of despatch/shipment.
iii) Date of receipt by the Railway.
iv) Date put into service.
v) Particulars of tests and trials carried out and reference to reports on these
vi) Particulars and serial number of major equipment initially provided
vii) Particulars of any major defects rectified or modifications carried out prior to commissioning.

b) Defects and failures during the Guarantee period:

i) Changes in Main Equipments:

PPO should record particulars of replacement of complete units of main equipment such as Traction Motors, Transformer, Rectifier, Pantograph etc., together with serial numbers of the original and substituted items and reasons for replacement.

k) Record of mechanical clearances with bearing on safety.

This History Book should be sent along with the loco/EMU to the workshop when the loco / EMU is booked for POH for heavy repairs and should be received back with the loco /EMU. The workshop should enter details of work done and modifications, if any carried out.

2. Equipment Cards: In the case of major items such as traction motors, transformers, rectifiers, circuit breakers, pantographs, tap-changers, auxiliary machines, bogies, wheels, etc. 'Equipment Card' should be maintained in the shed by the PPO so as to have for ready reference the history of the equipment. Individual Cards should be maintained for each unit of major equipment and the individual cards may be stored grouping them either equipment wise or loco-wise as convenient. The Equipment Cards should contain details as shown below:

30214 Unusual Occurrence Reports

A report indicating failure, withdrawal and any other technical abnormality in locomotive/EMU observed on line is called Unusual Occurrence Report (UOR). This should be made in each case recording in full detail as to what has actually happened and what steps should be taken in future to avoid recurrence.

While suitable proforma may be laid down by each Railway to suit local requirements, the UORs should basically contain the following details:

i) Report of Driver / Motorman detailing all his observations, together with remarks of TF(R) and Officers incharge of operation.

ii) Observations made by Maintenance Organization i.e. Technical Investigation Section, Maintenance Foreman and AEE/DEE (RS). A sample proforma is appended (Proforma 2.02).

UORs should be serially numbered for each calendar year to identify the homing shed, class of loco and serial number of the occurrence for the class of loco /EMU during the year e.g. TATA/WAG4/3/90. A copy of all UORs should be forwarded to CEE's office periodically.

30215 Periodical Review Information

Each homing shed should maintain requisite records and compile the following statistical information for each month. While the report on availability and reliability of the locomotive should be submitted to CEE every month, the report on the cost of repairs and maintenance should be submitted quarterly.

I Availability and Reliability

Locomotives
1. Average authorized stock (on allotment basis)
2. Average total number on line (on allotment basis)
3. Average number under or awaiting repairs (on allotment basis)
4. Average number effective (fit for use) (on allotment basis)
5. Actual number in good repair stored (on allotment basis)                                                                               5a. Average number available for use (on allotment basis)
6 Average number in use
7. Average number of engines on the line for operation
8. Percentage of total engine hours spent
9. Engine km per day per engine in use on individual services
10. Engine km per day per engine on line on individual services 
11 . Engine km per day per engine in use on all services
12 Engine km per day per engine in use on line (on allotment basis) 
13. Engine failure

EMUs
1. Average authorized stock (on allotment basis)
2. Average total number on line (on allotment basis)
3. Average number under or awaiting repairs (on allotment basis)
4. Average number effective (fit for use) (on allotment basis)
5. Actual number in good repair stored (on allotment basis) 
5a. Average number available for use (on allotment basis)
6. Average number in use
7. Train km, passenger
8. Hours
9. Vehicle km (in units)
10. Train Usage
11. Vehicle used
12. Motor coach failures
13. Gross tonne km
14. Power used

II Cost of Repairs and Maintenance

1. Engine km
2. Cost of repairs and maintenance per Engine km
3. Cost of repairs and maintenance per EMU stock (in units)

30216 Daily Loco/EMU Position

1. The Daily Loco/EMU position at 00.00 Hr, will be put up to CEE next morning. Over the years various railways have evolved their own proforma depending upon the local operating conditions.

2. The proforma as used on SE Railway indicating the Daily Loco position is enclosed (2.03).

3. The proforma as used by Eastern Railway indicating the EMU position is also enclosed (2 04).

4. Railway may evolve their own proforma based on these proformae

PROFORMA2.02

UOR NO............

...................................RAILWAY

UNUSUAL OCCURRENCE REPORT FOR ELECTRIC LOCOS/EMUs
                                                                                                                                 Date............... 

____________________________________________________________________________________________________

Driver's Report

1. Loco / Motor coach No.
2. Train No. and Time
3. Place of occurrence
4. Train Load
5. Catenary Voltage
6. Speed of train
7. Gradient at the place of occurrence
8. Weather conditions
9. Brief Description of occurrence
B. Observations of Operating Section

C. Observations of Maintenance Staff / Technical Investigation Section.

D. History of Locomotive / Motor coach Involved

1. Last inspection date:
2. Commissioning / IOH date:
3. Any special repair carried out on this loco / EMU:
4. Kilometres earned after last IOH:

E: Remarks of Sr DEE / DEE (RS)

1. Findings regarding causes of failure or damage:
2. Responsibility of staff:
3. Recommendations for modifications or improvement to equipment or maintenance schedule or operating instructions:
4. Action taken for rectification:

                                                                                                                                  Sr DEE / DEE (RS)


 

 

https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg RRB JE, SSC AE/JE UPSSSC JE, SSC JE, CIVIL ENGINEERING MCQs, ELECTICAL ENGINEERING MCQs, preavious year quesion papers, dmrc, lmrc, drdo,rrb ntpc, ntpc, pgcil, dsssb, states board, GATE IES EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,👇👇👇 https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,👇👇👇 https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA

No comments:

Featured Post

MAJOR 10 PANDEMICS (MAHAMARI) IN HISTORY

OUTBREAK: 10 OF THE WORST PANDEMICS IN HISTORY BY PRAVENDRA KUMAR RAJPOOT Scientists and medical researchers have for years have dif...