Sunday, January 15, 2023

ELECTRICAL (TRD)

ELECTRICAL (TRD)
2021/EEM/148/3/ACTM

Advance Correction Slip No. 34 to Railway Manual of AC traction (ACTM) Vol. II Part II Appendix-I Para No. 18.11, ACTM Volume-II, Part-II, Fig. A1.10 & ACTM Vol. II Part-l, Chapter-Vll, para 20703-Sub Para 4() with regard to distance between OHE structures and signal post.

19.12.2022
-- INDIAN RAILWAYS MANUAL OF AC TRACTION MAINTENANCE AND OPERATION VOLUME II (PART II) Nov 2022
--INDIAN RAILWAYS MANUAL OF AC TRACTION MAINTENANCE AND OPERATION VOLUME II (PART I) November 2022Nov 2022
--IR Manual of AC Traction Maintenance and Operation-Volume INov 2022
2021/EEM/148/3/ACTMAdvance Correction Slip No. 33 to Railway Manual of AC traction (ACTM) Vol-II Part II Appendix -I Para 18.12 with regard to arrangement of traction masts near level crossings and abutments of bridges.27.10.2021
2008/Elec(G)/170/1/PT.IIIIncrease in unit rates of Energy bill debits raised by Nodal Railways to other Railways.15.10.2020
2005/Elect(G)/161/8 Punct/Pt-IIIAdvance correction slip no. 32 in suppression to ACS no. 30 dated 22.10.2019 (LC gate09.10.2020
2002/EEM/161/21/Vol-IIImplementation of guidelines issued regarding composite insulators for 25 kV AC traction on Indian Railways.30.09.2020
2020/EEM/161/1Vol-IIReview of Periodicity of maintenance schedules.21.09.2020
2008/Elect(G)/170/1 Pt-III/Vol-II/(NTPC/RGPPL)Nomination of Northern Railway to file petition on behalf of issues pertaining to Zonal Railways in CERC/APTEL.28.08.2020
2012/Elect(G)/150/1Pt-IIILegal and application fees expenses for power management by REMCL.25.08.2020

2008/RE/170/3

ACTM correction slip no. 31  & Certificate of competency

20.01.2020

2005/Elect(G)/161/8/Punct/Pt-III

ACTM correction slip no. 30, modifying proforma

22.10.2019

2019/EEM/148/2

The central electricity authority (measures relating to safety and electric supply) regulations, 2010

06.06.2019

2013/Elect(G)/148/1

Revision of OHE maintenance schedule.

10.05.2019

2013/RE/161/22 (3226774)Advance Correction Slip no. 29 to Indian Railways Manual of AC Traction (ACTM) Vol-I, Chapter-IV Para-10436, 3(a), (b), (c) (Precautions For Movement of ODCs in 25 KV ac Electrified Sections).25.10.2018
2008/Elect(G)/170/1 Pt-III/NTPC/RGPPL/Vol-IIProvision of ABT meters along with associated equipments for availing power under open access on Traction Sub-Stations.23.02.18

2001/Elect(G)/170/1

Running of trains at 160 kmph on Delhi-Mumbai and Delhi-Howrah routes on trial basis.

04.12.2017

2008/Elect(G)/161/1 Punct/Vol-I

Maintenance of Tower Wagons – Improving Reliability.

23.02.2017

2008/Elect(G)/170/3 Pt

High tension three pulley ATD system.

29.12.2016

2001/Elect(G)/170/1

Inputs required for OHE & power supply system for 160 kmph train operation on existing routes.

22.12.2016

2010/Elect(G)/150/2 Pt

Revamping training facilities and system for TRD and General Service.

14.12.2016

2001/Elect(G)/170/1

Revision in OHE parameters for new electrification works undertaken by CORE, RVNL, IRCON or other agencies and undertaken by Railway through construction organization/open line.

22.11.2016

2001/Elect(G)/170/1

Inputs required for OHE and power supply system for 160 kmph train operation on Delhi-Howrah and Delhi-Mumbai routes.

19.10.2016

2015/RE/138/4 (FTS-137487)Advance Correction Slip No. 27 Modification to Earlier issued correction slip no. 18 to Railways Manual of AC Traction (ACTM) Vol-II Pt II, Appendix-IV – 1994 (Regulation for power Line Crossings of Railway tracks).06.05.2016
2006/Elect(G)/170/2 PtOutsourcing of PSI/TRD maintenance activities for electrified sections and sidings.03.06.2016
2013/RE/161/22 (FTS-82011)Advance Correction Slip no. 28 to Railways Manual of AC Traction (ACTM)/Vol-II Pt.II, Appendix-I. Inclusion Para-33 (For DC-AC conversion) (New addition of para-33)28.12.2015
2013/RE/161/22 (FTS-82011)Advance Correction Slip no. 25 to Railways Manual of AC Traction (ACTM) Vol-II, Pt-II, Appendix-I. Inclusion Para-33 (For DC-AC conversion). (New addition of Para-33).20.10.2014

2001/Elect(G)/170/1

Use of pantograph with 2032 mm width.

20.03.2014

2001/Elect(G)/138/4Pt-I

ACTM correction slip no. 24

10.01.2013

82/RE/250/1

Power supply arrangements for signaling & telecommunication installations in 25 kv AC areas.

13.09.2002

Open Access

2012/Elect(G)/150/1 Pt-III

Procurement of economical power for Non-traction for Zonal Railways & PUs.

02.06.2020

2018/Elect(G)/170/1

Power planning and procurement for Railways load.

19.12.2019

2008/Elect(G)/170/1 Pt-III/NTPC/RGPPL/Vol-II

Provision of ABT meters along with associated equipments for availing power under open access on Traction Sub-Stations.

23.02.2018

2008/Elect(G)/170/1 Pt-III/NTPC/RGPPL

Revised power allocation under comprehensive power plan for entire Indian Railways.

06.05.2016

2014/Elect(G)/150/4

Provision of Smart meters in TSS

22.09.2015

 

2012/Elect(G)/150/1 Pt-III

Procurement of economical power for Zonal Railways.

31.12.2014

2012/Elect(G)/150/1 Pt-III

Procurement of economical power for Zonal Railways.

30.12.2014

2010/Elect(G)/148/6

Provision of traffic block & power block charges for maintenance of power line crossings by DISCOM/State utilities/other owners.

13.08.2014

2012/Elect(G)/150/1 Pt-III

Procurement of power for Zonal Railways through bilateral arrangements.

16.05.2014

2013/Elect(G)/150/4

Undertaking power trading for procuring Electrical Energy at economical rate through REMCL.

15.04.2014

   
2008/Elect(G)/161/8 Pt.Trimming/cutting of trees in the electrified sections.05.09.2012
2005/Elect(G)/161/8 Punct. Pt-IISlewing or alterations to track involving adjustment of contact wire.17.08.2012
2005/Elect(G)/161/8 Punct. Pt-IGrid failures on 30.07.12 & 31.07.1206.08.2012
2008/Elect(G)/161/8 .Reliability improvement measures in TRD - Failures of brazing joints. 13.07.2012
2002/Elect(G)/161/21 Vol.-IICoprehensive policy regarding insulators for 25 kV AC traction on Indian Railways.04.07.2012
2008/Elect(G)/161/8 Pt.Evolving Grid Management Strategies to minimize the impact of power supply failure on train operation.14.06.2012
TI/CIV/Ms/12Guideline for OHE arrangements on TTC. 22/23.05.2012
TI/CIV/GCP/09Corrosion Resistant Paint System for Outdoor Structure of Traction Distribution. 21/23.05.2012
2001/Elect(G)/170/1 Pt.Provision of retro-reflective number plate on OHE mast.07.05.2012
2008/Elect(G)/161/8 Pt.OHE performance - reporting to Railway Board03.05.2012
2011/Sig/SF/1 Pt.Joint Procedure Order for protecting S&T & Electrical Cables. 23.04.2012
2011/Elect(G)/148/3Creation of new Plan Head - Traction Distribution Works. 04.04.2012
2011/CEDO/SD/IRSOD/Elect/02Addendum & Corrigendum Slip (ACS) No.- 7 to the Indian Railways Schedule of Dimensions (BG) 2004.14.03.2012
2010/Elect(G)/148/6Charges applicable for railways work being executed by outside agencies. 18.10.2011
2008/Elect(G)/161/8 Punct.Measures for improving OHE reliability - 12 points Action Plan.07.10.2011
82/Elect(G)/250/1 Pt.Drive for checking the health of power cables related with train operations.01.09.2011
2008/Elect(G)/161/1 Pt.Checking of power line crossing line. 11.01.2011
2010/Elect(G)/150/11Ensuring calibration and heath of energy meters based on which payments to supply authorities are made. 27.12.2010
2008/Elect(G)/161/8 Punct.Safe working by contractor.25.10.2010
2008/Elect(G)/161/8 Punct.Measures for improving OHE reliability.28.09.2010
2001/Elect(G)/170/1 Pt.Inputs required for running trains at 150 kmph speed.30.06.2009
2002/ACII/1/10 (vol-II)Revised Codel life of Assets.25.02.2009
2001/Elect(G)/138/3Manpower planning -norms.16.03.2006
84/RE/158/1 Pt.Maintenance of Tower Wagons31.01.2006
2002/PL/88/3Board had approved the following board policy guidelines for outsourcing various activities on Indian Railways in March 2004.28.01.2005

https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg https://www.youtube.com/channel/UC4_D50vMu1wbQrPaLFYo6Eg RRB JE, SSC AE/JE UPSSSC JE, SSC JE, CIVIL ENGINEERING MCQs, ELECTICAL ENGINEERING MCQs, preavious year quesion papers, dmrc, lmrc, drdo,rrb ntpc, ntpc, pgcil, dsssb, states board, GATE IES EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,👇👇👇 https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA https://t.me/pravendrarajpoot Daily news & current affairs in hindi & english fully updated Daily current affairs https://t.me/newsdailypkr Engineering Discussion group for your upcoming exams, you can ask your any query regarding your problem,👇👇👇 https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA PKR ELECTRICAL ENGINEERING I am sure this is the best place for you guys subscribe and get success IF YOU WANT TO JOIN ME ON TELEGRAM FOR PDF @newsdailypkr AE/JE EE, ESE, ECE, ME, CE, IT & CS EXAM MATERIALS & OLD PAPERS Electrical Engineering https://t.me/pravendrarajpoot facebook page:- Pravendra Kumar Rajpoot https://t.me/newsdailypkr https://chat.whatsapp.com/5AS7dNFTP4H4vVsiWsqHrT https://t.me/srk50 https://t.me/pravendrarajpoot https://t.me/joinchat/JObxeA7n6S4qvnegrGhTgA

No comments:

Featured Post

MAJOR 10 PANDEMICS (MAHAMARI) IN HISTORY

OUTBREAK: 10 OF THE WORST PANDEMICS IN HISTORY BY PRAVENDRA KUMAR RAJPOOT Scientists and medical researchers have for years have dif...